compact, four-stage oil-free compressor specifically designed for argon gas compression. Featuring a completely oil-free vertical lubrication system and air-cooling technology, this unit ensures pure, contamination-free argon output for industrial and laboratory applications. With its efficient multi-stage compression and reliable performance, it is ideal for welding, metal fabrication, and specialized gas handling processes.









Key Features
100% Oil-Free Operation: Ensures pure argon output without contamination
Four-Stage Compression: Efficient pressure boost up to 2.0 MPa
Air-Cooled System: No water cooling required, reducing operational complexity
Compact Design: Space-saving vertical configuration
Customizable Voltage: Available in 380V/50Hz or other specifications
Dual Fan Cooling: Enhanced heat dissipation for continuous operation
Reliable Components: Quality brand components for long service life
TECHNICAL DATA
| Parameter | Specification | Parameter | Specification |
|---|---|---|---|
| Medium | Argon (Ar) | Quantity | 1 Unit |
| Inlet Pressure | Micro Positive Pressure | Inlet Temperature | ≤40°C |
| Discharge Pressure | 2.0 MPa(G) | Discharge Temperature | ≤50°C |
| Flow Rate | 3 Nm³/h | Piston Stroke | 40 mm |
| Model | 32/10 | Compression Stages | 4 |
| Structural Style | Vertical Oil-Free | Cylinder Quantity | 4 |
| Shaft Speed | 380 rpm % | Voltage | 380V/50Hz (Customizable) |
| Cooling Mode | Air Cooling | Cooling Water Flow | -- |
| Shaft Power | ≤1.6 kW | Main Motor Speed | 970 rpm |
| Motor | 3 kW, 380V, 50Hz % | ||
| Dimensions | 1200×750×1100 mm % | Weight | 0.4 T % |
| Inlet/Outlet | 15 × M6×1.5 | Water Interface | -- |
| Drive Mode | Belt Drive | ||
| Gas Contact Materials | |||
| – Cylinder | Carbon Steel | ||
| – Air Valve | Stainless Steel | ||
| – Pipeline & Cooler | Stainless Steel |
Important Note
The gas compressed by the compressor must be dry and free of particles!
Argon Compressor Applications
Industrial welding and metal fabrication
Laboratory and research facilities
Steel manufacturing and metallurgy
Electronics and semiconductor production
Analytical instrument gas supply
Delivery Time: 50 days after contract signing and receipt of advance payment
Monday - Friday:8:30—17:00